Lead and Copper Service Line Inventory
AWWSB Completes Lead and Copper Service Line Inventory |
The Anniston Water Works and Sewer Board has successfully completed its Lead and Copper Service Line Inventory in accordance with the requirements of the Environmental Protection Agency (EPA) and the Alabama Department of Environmental Management (ADEM) under the revised Lead and Copper Rule (LCR) of the Safe Drinking Water Act (SDWA). This inventory, mandated under the Lead and Copper Rule Revisions (LCRR), is an essential step toward identifying lead and copper service lines within the system. The inventory has been completed in advance of the October 2024 reporting deadline, ensuring compliance with federal and state regulations designed to protect public health by minimizing lead exposure through drinking water. As part of the regulatory compliance process, a comprehensive review of the Anniston water distribution system was conducted to identify and classify service lines potentially containing lead or copper. The Lead Service Line Inventory, based on a template provided by ADEM, is available for public review. To access the inventory spreadsheet, please you may click here. This effort underscores the Anniston Water Works and Sewer Board’s commitment to ensuring the safety and quality of drinking water for all residents. The Board will continue to work closely with ADEM and the EPA to meet all required standards and timelines for public water systems. |